Residential · Bristol · Completed
Bristol Oak Flooring Replacement
Replacement of the existing floor finish with engineered oak boards, including local subfloor preparation, underlay installation, threshold detailing and perimeter finishing.
The challenge
Create a consistent finished surface while working around door thresholds, perimeter details and areas of the existing subfloor that required local preparation.
Scope completed
Replacement of the existing floor finish with engineered oak boards, including local subfloor preparation, underlay installation, threshold detailing and perimeter finishing.
The flooring replacement was completed in five days, delivering a continuous engineered-oak finish across the room.
From existing floor to finished oak
Original site photographs show the floor replacement progressing from local opening-up and preparation through underlay, installation and finishing details.